TITLE : Progress Report 6

WRITTEN BY : M.Borghi

 

 

SUMMARY : MOSAIC activities ( February/March/April 1998 )

No part of this document can be reproduced, in any form, or by any means, prior to written authorisation of the
MOSAIC Consortium


 


Table of Contents

1. Summary

2. Management

3. Technical

4. Situation of Current Work Packages

5. CONTRACTUAL ISSUES

6. ANNEX A : MOSAIC Action Items List

7. ANNEX B : DISSEMINATION PLAN

8. ANNEX C : PLANNING - (next page)

 


1. Summary

The document describes the main activities in MOSAIC done by Contractors and Participating Organisation during the period of February until April 1998.


2. Management

The main management activities performed have been:

All the MOSAIC documents produced till now have been inserted on the web both in HTML and .doc formats (delivered versions, summaries and drafts). At the present the documents on the web are: Work Package 1100: SURVEY on the STATE of the ART, Work Package 1100 (SUMMARY): SURVEY on the STATE of the ART Summary, Work Package 1200 (DRAFT): Market Plan, Work Package 1300 (DRAFT): Partner Research and Economical Agreement Definition, Work Package 1400: Target Users Profile Specifications, Work Package 1400 (SUMMARY): Target Users Profile Specifications Summary, Work Package 1500: Requirements Definition Document, Work Package 1500 (SUMMARY): Requirements Definition Summary, Work Package 1600 : Technical note on Application Reuse, Work Package 1600 (SUMMARY) Technical note on Application Reuse, Work Package 1700 : Architectural Document, Work Package 1700 (SUMMARY) Architectural Document, Work Package 1800 (DRAFT): Dissemination of Results.

 

 

 

The following Meetings and Conferences have been held:

 

 

 

 

The following contacts has been realised:


3. Technical

WP 1100. Closed

WP 1200. In progress. ABC method will be used. ABC is a consistent, disciplined process that is necessary to the functional process improvement effort in both an analytical and evaluation role. It is also a process that requires professional judgement and creativity when applied to a transitional business process model. This creativity does not invalidate the basic integrity of the idea, but is rather a necessity to bridge the gap from the traditional accounting data to the new process methodology. This idea will become more evident when ABC is compared to the traditional methods of costing. Although ABC is still an evolving discipline, it offers great advantages over these more traditional methods. Although evolving, ABC is nevertheless applied with sound accounting principles to translate cost data and to provide a reliable information source upon which to base managerial decisions.

Most current established accounting systems normally capture and distribute resource costs by one of the following methods:

Each of these methodologies has advantages and disadvantages which have met the past needs of the organisation. Yet, every one of them fails to meet the full requirement for management information that occurs as the result of a redesign of the organisation or any part of the organisation. ABC is a more representative distribution of resource use since the cost allocations are based on the direct cost drivers inherent in each of the work activities that make up the organisational structure. ABC applies resource use directly to the output products and services based on the actual work activities of the process that produces the output with limited arbitrary allocations of indirect or overhead costs.

WP 1300. Ongoing partner research and MOSAIC presentation. Will be extended for six months

WP 1400. Closed

WP 1500. Closed

WP 1600. Closed

WP 1700. Closed

WP 1800. Ongoing Dissemination Activities. An extended plan for the dissemination phase is presented in annex..
The period considered is until October 31st .

WP 2000. A detailed configuration of the demo service centre has been provided in the WP 1600 document. New item has been added in the web Demos section. Cultural on line browser is activated. Metadabase data population is in progress.

All deliverable has been reviewed by the Annual Review Commission. The detailed list of recommendation, mainly addressed to the WP 1200 deliverable, will be taken into account in the project extension phase.

Planning: has been reviewed on the basis of the six months extension

The following table illustrates a synthesis of the work in progress.

WP number

description

status

WP 1100

Survey of the "state of the art"

100%

WP 1200

Market plan

45%

WP 1300

Partner search and economical agreement definition

75%

WP 1400

Target User profile definition

100%

WP 1500

Requirements definition, tools, service centers, application

100%

WP 1600

Study for the reuse of existing applications into the defined architecture

100%

WP 1700

Architecture definition and tools definition

100%

WP 1800

Dissemination of results

10%

WP 1900

Management

78%

WP 2000

CSC model demonstrator

67%

 

 

4. Situation of Current Work Packages

 

WP’s

Responsible Partner of activity and Deliverables

1 - WP1100
Survey on the state of the art
Responsible :
DISET :
T0 -> T0+1

Milestones :
none

  • DISET
  • Joanneum Research
  • Arenotech

Deliverables :

  1. State of the art technical notes
  2. Recommendation for the architecture

2 - WP1200
Market Plan

  • Responsible : Banca di Roma
BDR :
T0+3->T0+16

Milestones :
T0+18
Assessment on feasibility study

  • Banca di Roma

Deliverables :

  1. Business Plan Document

1 - WP1300 
Partner Research and Economical Agreement Definition

Responsible :
DISET
T0->T0+18

Milestones :
T0+18

Assessment on feasibility study

  • DISET
  • Arenotech
  • Banca di Roma

Deliverables :

  1. Participation letters list updated
  2. Test mutual agreement contract ready to be used during the deployment

1 - WP1400 
Target User Profile Definition

Responsible :
ARENOTECH
T0->T0+4 (delay of one month)

Milestones :
none

  • Arenotech
  • Infobyte

Deliverables :

  1. Target user profile specification

2 - WP1500
Requirements, Tools, Service Centers, Application

Responsible :
INFOBYTE :
T0+3-> T0+6 (delay of one month)

Milestones :
T0+6 Requirements review

  • Joanneum research
  • Arenotech
  • DISET
  • ZGDV
  • Infobyte

Deliverables :

  1. Requirements definition document

3 - WP1600
Study for the Reuse of existing Application into the Defined Architecture

Responsible :
Joanneum
Research :
T0+6->T0+9 (delay of one month)

Milestones : none

  • Arenotech
  • ZGDV
  • Joanneum Research
  • Infobyte

Deliverables :

  1. Technical note on application reuse

3 - WP1700
Architecture Definition and tools definition

Responsible :
INFOBYTE
T0+6->T0+9 (delay of one month)

Milestones :
none

  • Infobyte
  • DISET
  • Joanneum Research

Deliverables :

  1. Architectural Document

4 - WP1800
Dissemination of results

Responsible :
DISET
T0+9->T0+18

Milestones :
T0+18 Assessment on feasibility study

  • DISET
  • Arenotech
  • CINECA

Deliverables :

  1. Workshop, electronic debates, feedback collection book

0 - WP1900
Management of the MOSAIC project for the feasibility study

Responsible :
BDR
T0->T0+18
Milestones :
T0+18 Assessment of feasibility study

  • Banca di Roma

Deliverables :

  1. progress reports
  2. final report

4 - WP2000
CSC model demonstrator

Responsible :
CINECA
T0+8->T0+15

Milestones :
T0+18 Assessment on feasibility study

  • CINECA
  • Joanneum Research
  • DISET
  • Infobyte

Deliverables :

  1. CSC model demonstrator running

5. CONTRACTUAL ISSUES

Some modifications has been applied:

Open issues:

 

ANNEX A : MOSAIC Action Items List

(updated: 30/04/98)

Ref.:

Orig.

Date & Ref.:

Action Short Description

Responsible

Expected date:

Status

A0001

Meeting of Paris 28th July 1997

produce internal monthly progress report to be sent at BDR at the end of each month

all partner

each months

A0002

WP 1200 planning

define the document layout and activate the joint team for the WP 1200

BDR

20th August 1997

closed

A0003

WP 1500 planning

define the document layout and activate the joint team for the WP 1500

INFOBYTE

20th August 1997

closed

A0004

September 97 meeting

define the detailed agenda and organise the technical and dissemination meeting

DISET

1st of September 1997

closed

A0005

October 97
meeting

define the detailed agenda and organise the technical and dissemination meeting

ARENOTECH

1st October 1997

closed

A0006

mid term review meeting

define with UE commission the expected date.

BDR

10th January 1998

closed

A0007

November meeting - internal mid term review

define the agenda and organise the technical and dissemination meeting

CINECA

1st November 1997

closed

A0008

December meeting

define the agenda and organise the technical and dissemination meeting

JRC or ZGDV

1st December 1997

closed

A0009

mosaic web

translate the document in French language

ARENOTECH

September 1997

closed

A00010

mosaic web

translate the document in German and Spanish language

ZGDV

September 1997

closed

A00011

mosaic tape

The MOSAIC tape is under preparation by BDR. Contribution are expected in U-MATIC tape.

all partner

1st September 1997

closed

A00012

mosaic web

activate the web in Italian language

CINECA

September 1997

closed

A00013

MOSAIC LOGO

prepare the MOSAIC suggested logos and select the final logo from a short list.

all partner

27th July 1997

closed

A00014

payment from UE

distribute percentage of founding to the partner

BDR

27th July 1997

closed

A00015

WP 1100 upgrading of the document

predispose the upgrading of the WP 1100 document

DISET

middle of February 1998

closed

A00016

WP 1600 TN first issue

manage the WP activities

JRC

end of February 1998

closed

A00017

WP 1700 document first issue

manage the WP activities

INFOBYTE

end of February 1998

closed

A00018

Annual Review

Re-plan the MOSAIC activities for the obtained 6 months delay

BDR

Progress report

 
A00019

Market plan

Take into account all the Review recommendations

BDR

WP 1200 document

 
A00020

Annual Review

Predispose a new plan for the demo activities

CINECA

WP 2000

 
A00021

Annual Review

Predispose a new plan for the dissemination activities

DISET

Progress Report

 

 

7. ANNEX B : DISSEMINATION PLAN

Date

Event

City

Partecipation

Presentation

Booth

Partner

10 February

Presentazione MOSAIC alla Città delle Science di Parigi

Paris (F)

 

x

 

ARENOTECH

11 February

La catalogazione delle collezioni d'arte delle banche (ABI)

Roma (I)

 

x

 

POLIMI

8-11 February

MILIA

Cannes (F)

x

   

INFOBYTE

25 Feb – 1 Mar

BIT – Borsa Internazionale del Turismo

Milano (I)

       

4-6 March

Imagina

Monaco

 

x

x

POLIMI
INFOBYTE

4-7 March

Euro-Med Net 98

Nicosia – Cyprus

 

x

 

POLIMI

19-25 March

CEBIT

Hannover (D)

     

ZGDV

25-27 March

BITE – Bringing Information Technology to Education

Maastricht – NL

 

x

 

POLIMI

25-28 March

CAA98 – Computer Applications In Archaeology

Barcelona (E)

     

B ROMA
INFOBYTE
CINECA

23-28 March

EVA '98 Florence

Florence (I)

     

Arenotech
POLIMI

27-28 March

MediArTech - MoU Plenary Assembly

Florence (I)

x

x

x

INFOBYTE
POLIMI

3-7 April

FutureShow

Bologna (I)

     

CINECA

3-6 April

Archeoland 98 - Restauro 98

Ferrara (I)

     

CINECA
POLIMI
INFOBTE

14-18 April

World Wide Conference

Brisbane – Australia

     

POLIMI

21-23 April

Multimedia Super Corridor

Kuala Lumpur
Malaysia

 

x

 

POLIMI

24-25 April

Auf dem Weg zur Digitelen Bibliothek
SunSummit

Gottingen (D)

     

ZGDV

27-29 April

Euro-Mediterranean Network Cooperation Cairo Workshop

Cairo - Egypt

x

x

x

POLIMI
INFOBYTE

14 May 98

Neue Medien und Kulturelles Erbe

Wien - A

 

x

 

JOHANNEUM

1-3 July

Virtual Words 98

Paris (F)

 

 

 

ZGDV

19-24 July

Siggraph

Orlando, Florida - USA

 

   

INFOBYTE
POLIMI
B. ROMA
CINECA

23-24 July

EVA 98 Cambridge

Cambridge

 

 

 

 

26-27 August

QPMIDS

Wien (A)

     

POLIMI

September

CULT H

Wien (A)

 

 

 

POLIMI

Mid Autumn

Scandinavian Museum Fair

Goteborg

 

 

 

 

1-5 Sept.

Ichim

Paris

       

2-6 September

UAB Multimedia

Palma de Mallorca (ES)

 

 

 

 

12-15 September

Cultural Heritage Network Hypermedia

Milan - (I)

 

   

POLIMI

24-25 September

EVA '98 Paris

Paris (F)

 

 

 

 

October

SMAU

Milan (I)

 

 

 

POLIMI

October

Frankfurt Buchmesse

Frankfurt (D)

 

 

 

 

 

 

 

 

8. ANNEX C : PLANNING - (next page)