Table of Contents
1. Summary2. Management
3. Technical
4. Situation of Current Work Packages
6. ANNEX A : MOSAIC Action Items List
The document describes the main activities in MOSAIC done by Contractors and Participating Organisation during the period of February until April 1998.
The main management activities performed have been:
All the MOSAIC documents produced till now have been inserted on the web both in HTML and .doc formats (delivered versions, summaries and drafts). At the present the documents on the web are: Work Package 1100: SURVEY on the STATE of the ART, Work Package 1100 (SUMMARY): SURVEY on the STATE of the ART Summary, Work Package 1200 (DRAFT): Market Plan, Work Package 1300 (DRAFT): Partner Research and Economical Agreement Definition, Work Package 1400: Target Users Profile Specifications, Work Package 1400 (SUMMARY): Target Users Profile Specifications Summary, Work Package 1500: Requirements Definition Document, Work Package 1500 (SUMMARY): Requirements Definition Summary, Work Package 1600 : Technical note on Application Reuse, Work Package 1600 (SUMMARY) Technical note on Application Reuse, Work Package 1700 : Architectural Document, Work Package 1700 (SUMMARY) Architectural Document, Work Package 1800 (DRAFT): Dissemination of Results.
The following Meetings and Conferences have been held:
The following contacts has been realised:
WP 1100. Closed
WP 1200. In progress. ABC method will be used. ABC is a consistent, disciplined process that is necessary to the functional process improvement effort in both an analytical and evaluation role. It is also a process that requires professional judgement and creativity when applied to a transitional business process model. This creativity does not invalidate the basic integrity of the idea, but is rather a necessity to bridge the gap from the traditional accounting data to the new process methodology. This idea will become more evident when ABC is compared to the traditional methods of costing. Although ABC is still an evolving discipline, it offers great advantages over these more traditional methods. Although evolving, ABC is nevertheless applied with sound accounting principles to translate cost data and to provide a reliable information source upon which to base managerial decisions.
Most current established accounting systems normally capture and distribute resource costs by one of the following methods:
Each of these methodologies has advantages and disadvantages which have met the past needs of the organisation. Yet, every one of them fails to meet the full requirement for management information that occurs as the result of a redesign of the organisation or any part of the organisation. ABC is a more representative distribution of resource use since the cost allocations are based on the direct cost drivers inherent in each of the work activities that make up the organisational structure. ABC applies resource use directly to the output products and services based on the actual work activities of the process that produces the output with limited arbitrary allocations of indirect or overhead costs.
WP 1300. Ongoing partner research and MOSAIC presentation. Will be extended for six months
WP 1400. Closed
WP 1500. Closed
WP 1600. Closed
WP 1700. Closed
WP 1800. Ongoing Dissemination Activities. An extended plan for the dissemination phase is presented in annex..
The period considered is until October 31st .
WP 2000. A detailed configuration of the demo service centre has been provided in the WP 1600 document. New item has been added in the web Demos section. Cultural on line browser is activated. Metadabase data population is in progress.
All deliverable has been reviewed by the Annual Review Commission. The detailed list of recommendation, mainly addressed to the WP 1200 deliverable, will be taken into account in the project extension phase.
Planning: has been reviewed on the basis of the six months extension
The following table illustrates a synthesis of the work in progress.
WP number |
description |
status |
WP 1100 |
Survey of the "state of the art" |
100% |
WP 1200 |
Market plan |
45% |
WP 1300 |
Partner search and economical agreement definition |
75% |
WP 1400 |
Target User profile definition |
100% |
WP 1500 |
Requirements definition, tools, service centers, application |
100% |
WP 1600 |
Study for the reuse of existing applications into the defined architecture |
100% |
WP 1700 |
Architecture definition and tools definition |
100% |
WP 1800 |
Dissemination of results |
10% |
WP 1900 |
Management |
78% |
WP 2000 |
CSC model demonstrator |
67% |
4. Situation of Current Work Packages
WPs |
Responsible Partner of activity and Deliverables |
1 - WP1100 Milestones : |
Deliverables :
|
2 - WP1200
T0+3->T0+16 Milestones : |
Deliverables :
|
1 - WP1300 Responsible : Milestones : Assessment on feasibility study |
Deliverables :
|
1 - WP1400 Responsible : Milestones : |
Deliverables :
|
2 - WP1500 Responsible : Milestones : |
Deliverables :
|
|
3 - WP1600 Responsible : Milestones : none |
Deliverables :
|
3 - WP1700 Responsible : Milestones : |
Deliverables :
|
4 - WP1800 Responsible : Milestones : |
Deliverables :
|
0 - WP1900 Responsible : |
Deliverables :
|
4 - WP2000 Responsible : Milestones : |
Deliverables :
|
Some modifications has been applied:
Open issues:
ANNEX A : MOSAIC Action Items List
(updated: 30/04/98)
|
Ref.: |
Orig. Date & Ref.: |
Action Short Description |
Responsible |
Expected date: |
Status |
| A0001 | Meeting of Paris 28th July 1997 |
produce internal monthly progress report to be sent at BDR at the end of each month |
all partner |
each months |
|
| A0002 | WP 1200 planning |
define the document layout and activate the joint team for the WP 1200 |
BDR |
20th August 1997 |
closed |
| A0003 | WP 1500 planning |
define the document layout and activate the joint team for the WP 1500 |
INFOBYTE |
20th August 1997 |
closed |
| A0004 | September 97 meeting |
define the detailed agenda and organise the technical and dissemination meeting |
DISET |
1st of September 1997 |
closed |
| A0005 | October 97 |
define the detailed agenda and organise the technical and dissemination meeting |
ARENOTECH |
1st October 1997 |
closed |
| A0006 | mid term review meeting |
define with UE commission the expected date. |
BDR |
10th January 1998 |
closed |
| A0007 | November meeting - internal mid term review |
define the agenda and organise the technical and dissemination meeting |
CINECA |
1st November 1997 |
closed |
| A0008 | December meeting |
define the agenda and organise the technical and dissemination meeting |
JRC or ZGDV |
1st December 1997 |
closed |
| A0009 | mosaic web |
translate the document in French language |
ARENOTECH |
September 1997 |
closed |
| A00010 | mosaic web |
translate the document in German and Spanish language |
ZGDV |
September 1997 |
closed |
| A00011 | mosaic tape |
The MOSAIC tape is under preparation by BDR. Contribution are expected in U-MATIC tape. |
all partner |
1st September 1997 |
closed |
| A00012 | mosaic web |
activate the web in Italian language |
CINECA |
September 1997 |
closed |
| A00013 | MOSAIC LOGO |
prepare the MOSAIC suggested logos and select the final logo from a short list. |
all partner |
27th July 1997 |
closed |
| A00014 | payment from UE |
distribute percentage of founding to the partner |
BDR |
27th July 1997 |
closed |
| A00015 | WP 1100 upgrading of the document |
predispose the upgrading of the WP 1100 document |
DISET |
middle of February 1998 |
closed |
| A00016 | WP 1600 TN first issue |
manage the WP activities |
JRC |
end of February 1998 |
closed |
| A00017 | WP 1700 document first issue |
manage the WP activities |
INFOBYTE |
end of February 1998 |
closed |
| A00018 | Annual Review |
Re-plan the MOSAIC activities for the obtained 6 months delay |
BDR |
Progress report |
|
| A00019 | Market plan |
Take into account all the Review recommendations |
BDR |
WP 1200 document |
|
| A00020 | Annual Review |
Predispose a new plan for the demo activities |
CINECA |
WP 2000 |
|
| A00021 | Annual Review |
Predispose a new plan for the dissemination activities |
DISET |
Progress Report |
7. ANNEX B : DISSEMINATION PLAN
Date |
Event |
City |
Partecipation |
Presentation |
Booth |
Partner |
10 February |
Presentazione MOSAIC alla Città delle Science di Parigi |
Paris (F) |
x |
ARENOTECH |
||
11 February |
La catalogazione delle collezioni d'arte delle banche (ABI) |
Roma (I) |
x |
POLIMI |
||
8-11 February |
MILIA |
Cannes (F) |
x |
INFOBYTE |
||
25 Feb 1 Mar |
BIT Borsa Internazionale del Turismo |
Milano (I) |
||||
4-6 March |
Imagina |
Monaco |
x |
x |
POLIMI |
|
4-7 March |
Euro-Med Net 98 |
Nicosia Cyprus |
x |
POLIMI |
||
19-25 March |
CEBIT |
Hannover (D) |
ZGDV |
|||
25-27 March |
BITE Bringing Information Technology to Education |
Maastricht NL |
x |
POLIMI |
||
25-28 March |
CAA98 Computer Applications In Archaeology |
Barcelona (E) |
B ROMA |
|||
23-28 March |
EVA '98 Florence |
Florence (I) |
Arenotech |
|||
27-28 March |
MediArTech - MoU Plenary Assembly |
Florence (I) |
x |
x |
x |
INFOBYTE |
3-7 April |
FutureShow |
Bologna (I) |
CINECA |
|||
3-6 April |
Archeoland 98 - Restauro 98 |
Ferrara (I) |
CINECA |
|||
14-18 April |
World Wide Conference |
Brisbane Australia |
POLIMI |
|||
21-23 April |
Multimedia Super Corridor |
Kuala Lumpur |
x |
POLIMI |
||
24-25 April |
Auf dem Weg zur Digitelen Bibliothek |
Gottingen (D) |
ZGDV |
|||
27-29 April |
Euro-Mediterranean Network Cooperation Cairo Workshop |
Cairo - Egypt |
x |
x |
x |
POLIMI |
14 May 98 |
Neue Medien und Kulturelles Erbe |
Wien - A |
x |
JOHANNEUM |
||
1-3 July |
Virtual Words 98 |
Paris (F) |
|
|
ZGDV |
|
19-24 July |
Siggraph |
Orlando, Florida - USA |
|
INFOBYTE |
||
23-24 July |
EVA 98 Cambridge |
Cambridge |
|
|
|
|
26-27 August |
QPMIDS |
Wien (A) |
POLIMI |
|||
September |
CULT H |
Wien (A) |
|
|
POLIMI |
|
Mid Autumn |
Scandinavian Museum Fair |
Goteborg |
|
|
|
|
1-5 Sept. |
Ichim |
Paris |
||||
2-6 September |
UAB Multimedia |
Palma de Mallorca (ES) |
|
|
|
|
12-15 September |
Cultural Heritage Network Hypermedia |
Milan - (I) |
|
POLIMI |
||
24-25 September |
EVA '98 Paris |
Paris (F) |
|
|
|
|
October |
SMAU |
Milan (I) |
|
|
POLIMI |
|
October |
Frankfurt Buchmesse |
Frankfurt (D) |
|
|
|
8. ANNEX C : PLANNING - (next page)