WRITTEN BY: M.Borghi
SUMMARY : MOSAIC activities (November/December/January months)
No part of this document can be reproduced, in any form, or by any means, prior to written authorisation of the
MOSAIC Consortium
Table of Contents
1. Summary
2. Management
3. Technical
4. Situation of Current Work Packages
5. Contractual Issues
6. ANNEX A: MOSAIC Action Items List
7. ANNEX B: DISSEMINATION PLAN
8. ANNEX C: PLANNING - (next page)
1. Summary
The document describes the main activities in MOSAIC done by Contractors and Participating Organisation during the period of December 1997 and January 1998.
The main management activities performed have been:
- contractual issues clarification and cost statement preparation
- web site in progress upgrading and management
- working meeting organisation:
- up 13th to 14th January Meeting in Graz
- 28th October meeting in Brussels
- secretary project organisation
All the MOSAIC documents produced till now have been inserted on the web both in HTML and .doc formats (delivered versions, summaries and drafts). At the present the documents on the web are: Work Package 1100: SURVEY on the STATE of the ART, Work Package 1100 (SUMMARY): SURVEY on the STATE of the ART Summary, Work Package 1200 (DRAFT): Market Plan, Work Package 1300 (DRAFT): Partner Research and Economical Agreement Definition, Work Package 1400: Target Users Profile Specifications, Work Package 1400 (SUMMARY): Target Users Profile Specifications Summary, Work Package 1500: Requirements Definition Document, Work Package 1500 (SUMMARY): Requirements Definition Summary, Work Package 1600 (DRAFT): Technical note on Application Reuse, Work Package 1700 (DRAFT): Architectural Document, Work Package 1800 (DRAFT): Dissemination of Results
The following Meetings and Conferences have been held:
- IMDAS Presentation Meeting, Cologne 26 - 28/10/1997
- IMDAS Presentation Seminar, Stuttgart 29 - 30/10/1997
- Conservation Institute Workshop - Goteborg 17-18-19/11/1997
- IMDAS Presentation Meeting, Stuttgart 18 - 19/11/1997
- Seminar on MuseumInformatics, Vienna 21 - 21/11/1997
- ICOM Austria Annual Meeting, Vienna 27/11/1997
- "Digital Cities" - Berlin - 1-2/12/1997
- Workshop on "Multimedia access", Vienna 4 - 5/12/1997
- Sophia Antipolis 7 - 9/12/97
The following contacts has been realised:
- Media Designer Assoc. Inc Graz
- Hewlett Packard Austria
- AIT - Applied Information Technologies, Gesmbh, Graz
- Soprintendenza degli Abruzzi
- Soprintendenza di Napoli
- Regione Lazio - Assessorato alla Cultura e Turismo
- Ambasciata Francese in Italia
- Zeppelin Museum, Friedrichshafen
- Deutsches Hygienemuseum, Dresden
- Landschaftsverband Süd-Niedersachsen e.V., Northeim
- Übersee-Museum, Bremen
- Haus der Geschichte, Bonn
- Fondazione San Paolo di Torino
- Associazione Bancaria Italiana (ABI)
- Fondation Sophia Antipolis (F)
WP 1100. The executive summary of the WP 1100 has been delivered. The first issue of guidelines and recommendation has been presented as forecasted in the previous delivery. Main EC remarks outlined in the mid term review meeting in Brussels has been already taken in consideration. A new release of the WP 1100 document including new technological contribution will be provided as foreseen the middle of February.
WP 1200. In progress. A draft version of trial test agreement is ready.
WP 1300. Ongoing partner research and MOSAIC presentation. The in progress agreements with the major vendors have been outlined (Microsoft, HP, Apple, Silicon Graphics, 3M Imation, Italtel...), and the same in reference to major content providers and partners in dissemination ( ABI, MAE, CHIN, Fondazione SanPaolo, Regione Friuli, VG...). The Mosaic additional partner list is increasing (see the Web MOSAIC in the additional partner area.
WP1400 and WP 1500. The summaries of WP 1400 (User Target Profile Definition) and WP 1500 (Requirements Definition Document) has been produced and delivered. The Executive Summary documents delivered (WP 1400 and WP 1500) are in line with the EC request. The mid term review of the document has been done in Brussels.
WP1600 and WP 1700. Started the work is in progress. The document draft will updated on the web.
WP1800: Ongoing Dissemination Activities.A plan for the dissemination phase is presented in annex. Remarks from the EC are expected not later the middle of March. ( This document is already available on the Web ).
WP 2000 has been activated and the invitation to the EC to see the demo centre of Bologna has been renewed. The first feeling on the activated services is in line with the expectations. A detailed configuration of the demo service centre will be provided in the WP 1600 document. New item has been added in the Demos section of the web like "3D tools on the web", "IPR Intellectual Property Rights", "Computing and Networking Applied to Cultural Heritage". The preliminary design phase of the MOSAIC metadatabase is closed. An alpha version of the MOSAIC Metadatabase has been activated, in addition some collections have been added to test the overall functionality of the search engine. A prototype of cultural browser MS Explorer IEAK based has been developed.
Planning: the planning is in line with the presented status in Brussels.
The following table illustrates a synthesis of the work in progress.
WP number description status WP 1100 Survey of the "state of the art" 100% WP 1200 Market plan 35% WP 1300 Partner search and economical agreement definition 75% WP 1400 Target User profile definition 100% WP 1500 Requirements definition, tools, service centers, application 100% WP 1600 Study for the reuse of existing applications into the defined architecture 55% WP 1700 Architecture definition and tools definition 55% WP 1800 Dissemination of results 10% WP 1900 Management 78% WP 2000 CSC model demonstrator 57%
4. Situation of Current Work Packages
WP's Responsible Partner of activity and Deliverables 1 - WP1100
Survey on the state of the art
Responsible :
DISET :
T0 -> T0+1Milestones :
none
- DISET
- Joanneum Research
- Arenotech
Deliverables :
- State of the art technical notes
- Recommendation for the architecture
2 - WP1200
Market PlanResponsible :
BDR :
T0+3->T0+10Milestones :
T0+12 Assessment on feasibility study
- Banca di Roma
- Arenotech
Deliverables :
- Business Plan Document
1 - WP1300
Partner Research and Economical Agreement DefinitionResponsible :
DISET
T0->T0+12Milestones :
T0+12 Assessment on feasibility study
- DISET
- Arenotech
- Banca di Roma
Deliverables :
- Participation letters list updated
- Test mutual agreement contract ready to be used during the deployment
1 - WP1400
Target User Profile DefinitionResponsible :
ARENOTECH
T0->T0+4 (delay of one month)Milestones :
none
- Arenotech
- Infobyte
Deliverables :
- Target user profile specification
2 - WP1500
Requirements, Tools, Service Centers, ApplicationResponsible :
INFOBYTE :
T0+3-> T0+6 (delay of one month)Milestones :
T0+6 Requirements review
- Joanneum research
- Arenotech
- DISET
- ZGDV
- Infobyte
Deliverables :
- Requirements definition document
3 - WP1600
Study for the Reuse of existing Application into the Defined ArchitectureResponsible :
Joanneum
Research :
T0+6->T0+9 (delay of one month)Milestones : none
- Arenotech
- ZGDV
- Joanneum Research
- Infobyte
Deliverables :
- Technical note on application reuse
3 - WP1700
Architecture Definition and tools definitionResponsible :
INFOBYTE
T0+6->T0+9 (delay of one month)Milestones :
none
- Infobyte
- DISET
- Joanneum Research
Deliverables :
- Architectural Document
4 - WP1800
Dissemination of resultsResponsible :
DISET
T0+9->T0+12Milestones :
T0+12 Assessment on feasibility study
- DISET
- Arenotech
- CINECA
Deliverables :
- Workshop, electronic debates, feedback collection book
0 - WP1900
Management of the MOSAIC project for the feasibility studyResponsible :
BDR
T0->T0+12
Milestones :
T0+12 Assessment of feasibility study
- Banca di Roma
Deliverables :
- progress reports
- final report
4 - WP2000
CSC model demonstratorResponsible :
CINECA
T0+8->T0+12 (anticipated )Milestones :
T0+12 Assessment on feasibility study
- CINECA
- Joanneum Research
- DISET
- Infobyte
Deliverables :
- CSC model demonstrator running
The cost statements of Contractors in original form has been delivered by the Co-ordinator to the EC.
The Arenotech cost statement is suspended until the internal Arenotech situation is clarified.
Infobyte has to define and submit a strategy to the EC in order to manage the Arenotech situation.
The EC will analyse the delivered cost statement and will contact the Co-ordinator for major unclear aspects.Open issues:
- Arenotech situation : management of P.O. accounting in the next Infobyte cost statement.
- The overheads to be considered are referred to the real organisation situation for the project.
- Budgetary figures modification could be applied in the final cost statement with reference to the contract accepted percentage and with reference to the global project breakdown. According to this rule, effort may be transferred between WPs within the budget allocated to a particular Contractor, and within the global breakdown of costs for this Contractor. If this reallocation of efforts between WPs for a particular Contractor leads to a reallocation of the tasks among the Partners, than an amendment to the contract has to be requested.
- Contractual extension automatic renewed
6. ANNEX A: MOSAIC Action Items List
(updated: 31/01/98)
Ref.: Orig.
Date & Ref.:Action Short Description Responsible Expected date: Status A0001 Meeting of Paris 28th July 1997 produce internal monthly progress report to be sent at BDR at the end of each month all partner each
monthsA0002 WP 1200
planningdefine the document layout and activate the joint team for the WP 1200 BDR 20th August 1997 closed A0003 WP 1500
planningdefine the document layout and activate the joint team for the WP 1500 INFOBYTE 20th August 1997 closed A0004 September 97 meeting define the detailed agenda and organise the technical and dissemination meeting DISET 1st of September 1997 closed A0005 October 97
meetingdefine the detailed agenda and organise the technical and dissemination meeting ARENOTECH 1st October 1997 closed A0006 mid term review meeting define with UE commission the expected date. BDR 10th January 1998 closed A0007 November meeting - internal mid term review define the agenda and organise the technical and dissemination meeting CINECA 1st November 1997 closed A0008 December
meetingdefine the agenda and organise the technical and dissemination meeting JRC or ZGDV 1st December 1997 closed A0009 mosaic web translate the document in French language ARENOTECH September 1997 closed A00010 mosaic web translate the document in German and Spanish language ZGDV September 1997 closed A00011 mosaic tape The MOSAIC tape is under preparation by BDR. Contribution are expected in U-MATIC tape. all partner 1st September 1997 closed A00012 mosaic web activate the web in Italian language CINECA September 1997 closed A00013 MOSAIC LOGO prepare the MOSAIC suggested logos and select the final logo from a short list. all partner 27th July 1997 closed A00014 payment from UE distribute percentage of founding to the partner BDR 27th July 1997 closed A00015 WP 1100 upgrading of the document predispose the upgrading of the WP 1100 document DISET middle of February
1998A00016 WP 1600 TN first issue manage the WP activities JRC end of February 1998 A00017 WP 1700 document first issue manage the WP activities INFOBYTE end of February 1998
7. ANNEX B: DISSEMINATION PLAN
Date Event City Partecipation Presentation Booth Partner 10.01.97 nfo Day Educational Multimedia Brussels (B) 17 January 98 3 Incontro Tecnico Nazionale ARI Associazione Restauratori Italiani Assisi (I) 02 97 Art Education Nouvelles Technologies Paris (F) 10 February Presentazione MOSAIC alla Città delle Science di Parigi Paris (F) 11 February La catalogazione delle collezioni d'arte delle banche (ABI) Roma (I) POLIMI 8-11 February MILIA Cannes (F) x x INFOBYTE 25 Feb - 1 Mar BIT - Borsa Internazionale del Turismo Milan (I) 4-6 March Imagina Monaco x x x POLIMI
INFOBYTE4-7 March Euro-Med Net 98 Nicosia - Cyprus POLIMI 10 March ICOM-Workshop for "Digital Realization of Images in Museums" Vienna - AU 19-25 March CEBIT Hannover (D) POLIMI 25-27 March BITE - Bringing Information Technology to Education Maastricht - NL POLIMI 25-28 March CAA98 - Computer Applications In
ArchaeologyBarcelona (E) B ROMA
INFOBYTE
CINECA23-28 March EVA '98 Florence Florence (I) ARENOTECH 27-28 March MediArTech - MoU Plenary Assembly Florence (I) x x x INFOBYTE
POLIMIMarch/April G7 General Meeting Roma (I) INFOBYTE
POLIMI3-7 April FutureShow Bologna (I) CINECA 6-10 April EVA '98 Gifu Gifu (J) 3-6 April Archeoland 98 - Restauro 98 Ferrara (I) CINECA 14-18 April World Wide Conference Brisbane - Australia POLIMI 22-25 April Museums and the Web 1998 Toronto (CA) VELTMAN 27-29 April Euro-Mediterranean Network Cooperation Cairo Workshop Cairo - Egypt x POLIMI
INFOBYTE27-29 May EVA '98 Athens Athens 20 May Multimedia Super Corridor London, UK 4-6 June EVA '98 Bucharest Bucharest (R) Convegni SOMEDIA SIME Paris (F) June CERAM Sophia Antipolis (F) 1-3 July Virtual Words 98 Paris (F) POLIMI 7-10 July IEEE-ISIE '98 Portugal POLIMI 19-24 July Siggraph Orlando, Florida - USA INFOBYTE
POLIMI23-24 July EVA 98 Cambridge Cambridge (UK) September CULT H Wien (A) POLIMI 1-5 September Ichim Paris (F) Mid Autumn Scandinavian Museum Fair Goteborg 2-6 September UAB Multimedia Palma de Mallorca (ES) 8-12 September Smart Communities 12-15 September Cultural Heritage Network Hypermedia Milan - (I) POLIMI 24-25 September EVA '98 Paris Paris (F) October SMAU Milan (I) POLIMI October Frankfurt Buchmesse Frankfurt (D) 2 December EVA '98 Vienna Wien (A) 6 December SalonBit Torino 7 December EVA '98 Los Angeles LA (CA)
8. ANNEX C: PLANNING - (next page)