TITLE : Progress Report 5

WRITTEN BY: M.Borghi


SUMMARY : MOSAIC activities (November/December/January months)

No part of this document can be reproduced, in any form, or by any means, prior to written authorisation of the
MOSAIC Consortium





Table of Contents

1. Summary
2. Management
3. Technical
4. Situation of Current Work Packages
5. Contractual Issues
6. ANNEX A: MOSAIC Action Items List
7. ANNEX B: DISSEMINATION PLAN
8. ANNEX C: PLANNING - (next page)



1. Summary
The document describes the main activities in MOSAIC done by Contractors and Participating Organisation during the period of December 1997 and January 1998.


2. Management

The main management activities performed have been:

All the MOSAIC documents produced till now have been inserted on the web both in HTML and .doc formats (delivered versions, summaries and drafts). At the present the documents on the web are: Work Package 1100: SURVEY on the STATE of the ART, Work Package 1100 (SUMMARY): SURVEY on the STATE of the ART Summary, Work Package 1200 (DRAFT): Market Plan, Work Package 1300 (DRAFT): Partner Research and Economical Agreement Definition, Work Package 1400: Target Users Profile Specifications, Work Package 1400 (SUMMARY): Target Users Profile Specifications Summary, Work Package 1500: Requirements Definition Document, Work Package 1500 (SUMMARY): Requirements Definition Summary, Work Package 1600 (DRAFT): Technical note on Application Reuse, Work Package 1700 (DRAFT): Architectural Document, Work Package 1800 (DRAFT): Dissemination of Results



The following Meetings and Conferences have been held:


The following contacts has been realised:


3. Technical

WP 1100. The executive summary of the WP 1100 has been delivered. The first issue of guidelines and recommendation has been presented as forecasted in the previous delivery. Main EC remarks outlined in the mid term review meeting in Brussels has been already taken in consideration. A new release of the WP 1100 document including new technological contribution will be provided as foreseen the middle of February.

WP 1200. In progress. A draft version of trial test agreement is ready.

WP 1300. Ongoing partner research and MOSAIC presentation. The in progress agreements with the major vendors have been outlined (Microsoft, HP, Apple, Silicon Graphics, 3M Imation, Italtel...), and the same in reference to major content providers and partners in dissemination ( ABI, MAE, CHIN, Fondazione SanPaolo, Regione Friuli, VG...). The Mosaic additional partner list is increasing (see the Web MOSAIC in the additional partner area.

WP1400 and WP 1500. The summaries of WP 1400 (User Target Profile Definition) and WP 1500 (Requirements Definition Document) has been produced and delivered. The Executive Summary documents delivered (WP 1400 and WP 1500) are in line with the EC request. The mid term review of the document has been done in Brussels.

WP1600 and WP 1700. Started the work is in progress. The document draft will updated on the web.

WP1800: Ongoing Dissemination Activities.A plan for the dissemination phase is presented in annex. Remarks from the EC are expected not later the middle of March. ( This document is already available on the Web ).

WP 2000 has been activated and the invitation to the EC to see the demo centre of Bologna has been renewed. The first feeling on the activated services is in line with the expectations. A detailed configuration of the demo service centre will be provided in the WP 1600 document. New item has been added in the Demos section of the web like "3D tools on the web", "IPR Intellectual Property Rights", "Computing and Networking Applied to Cultural Heritage". The preliminary design phase of the MOSAIC metadatabase is closed. An alpha version of the MOSAIC Metadatabase has been activated, in addition some collections have been added to test the overall functionality of the search engine. A prototype of cultural browser MS Explorer IEAK based has been developed.

Planning: the planning is in line with the presented status in Brussels.

The following table illustrates a synthesis of the work in progress.

WP number
description
status
WP 1100Survey of the "state of the art"
100%
WP 1200Market plan
35%
WP 1300Partner search and economical agreement definition
75%
WP 1400Target User profile definition
100%
WP 1500Requirements definition, tools, service centers, application
100%
WP 1600Study for the reuse of existing applications into the defined architecture
55%
WP 1700Architecture definition and tools definition
55%
WP 1800Dissemination of results
10%
WP 1900Management
78%
WP 2000CSC model demonstrator
57%


4. Situation of Current Work Packages


WP'sResponsible Partner of activity and Deliverables
1 - WP1100
Survey on the state of the art
Responsible :
DISET :
T0 -> T0+1

Milestones :
none

  • DISET
  • Joanneum Research
  • Arenotech

Deliverables :

  1. State of the art technical notes
  2. Recommendation for the architecture
2 - WP1200
Market Plan

Responsible :
BDR :
T0+3->T0+10

Milestones :
T0+12 Assessment on feasibility study

  • Banca di Roma
  • Arenotech

Deliverables :

  1. Business Plan Document

1 - WP1300 
Partner Research and Economical Agreement Definition

Responsible :
DISET
T0->T0+12

Milestones :
T0+12 Assessment on feasibility study

  • DISET
  • Arenotech
  • Banca di Roma

Deliverables :

  1. Participation letters list updated
  2. Test mutual agreement contract ready to be used during the deployment

1 - WP1400 
Target User Profile Definition

Responsible : ARENOTECH
T0->T0+4 (delay of one month)

Milestones :
none

  • Arenotech
  • Infobyte

Deliverables :

  1. Target user profile specification

2 - WP1500
Requirements, Tools, Service Centers, Application

Responsible :
INFOBYTE :
T0+3-> T0+6 (delay of one month)

Milestones :
T0+6 Requirements review

  • Joanneum research
  • Arenotech
  • DISET
  • ZGDV
  • Infobyte

Deliverables :

  1. Requirements definition document
3 - WP1600
Study for the Reuse of existing Application into the Defined Architecture

Responsible :
Joanneum
Research :
T0+6->T0+9 (delay of one month)

Milestones : none

  • Arenotech
  • ZGDV
  • Joanneum Research
  • Infobyte

Deliverables :

  1. Technical note on application reuse

3 - WP1700
Architecture Definition and tools definition

Responsible :
INFOBYTE
T0+6->T0+9 (delay of one month)

Milestones :
none

  • Infobyte
  • DISET
  • Joanneum Research

Deliverables :

  1. Architectural Document

4 - WP1800
Dissemination of results

Responsible :
DISET
T0+9->T0+12

Milestones :
T0+12 Assessment on feasibility study

  • DISET
  • Arenotech
  • CINECA

Deliverables :

  1. Workshop, electronic debates, feedback collection book

0 - WP1900
Management of the MOSAIC project for the feasibility study

Responsible :
BDR
T0->T0+12
Milestones :
T0+12 Assessment of feasibility study

  • Banca di Roma

Deliverables :

  1. progress reports
  2. final report
4 - WP2000
CSC model demonstrator

Responsible :
CINECA
T0+8->T0+12 (anticipated )

Milestones :
T0+12 Assessment on feasibility study

  • CINECA
  • Joanneum Research
  • DISET
  • Infobyte

Deliverables :

  1. CSC model demonstrator running


5. Contractual Issues

The cost statements of Contractors in original form has been delivered by the Co-ordinator to the EC.
The Arenotech cost statement is suspended until the internal Arenotech situation is clarified.
Infobyte has to define and submit a strategy to the EC in order to manage the Arenotech situation.
The EC will analyse the delivered cost statement and will contact the Co-ordinator for major unclear aspects.

Open issues:


6. ANNEX A: MOSAIC Action Items List

(updated: 31/01/98)
Ref.: Orig.
Date & Ref.:
Action Short Description ResponsibleExpected date: Status
A0001Meeting of Paris 28th July 1997produce internal monthly progress report to be sent at BDR at the end of each monthall partnereach
months
 
A0002WP 1200
planning
define the document layout and activate the joint team for the WP 1200 BDR20th August 1997
closed
A0003WP 1500
planning
define the document layout and activate the joint team for the WP 1500 INFOBYTE20th August 1997
closed
A0004September 97 meetingdefine the detailed agenda and organise the technical and dissemination meetingDISET1st of September 1997
closed
A0005October 97
meeting
define the detailed agenda and organise the technical and dissemination meeting ARENOTECH1st October 1997
closed
A0006mid term review meetingdefine with UE commission the expected date.BDR10th January 1998
closed
A0007November meeting - internal mid term reviewdefine the agenda and organise the technical and dissemination meetingCINECA1st November 1997
closed
A0008December
meeting
define the agenda and organise the technical and dissemination meetingJRC or ZGDV1st December 1997
closed
A0009mosaic webtranslate the document in French languageARENOTECHSeptember 1997
closed
A00010mosaic webtranslate the document in German and Spanish languageZGDVSeptember 1997
closed
A00011mosaic tape The MOSAIC tape is under preparation by BDR. Contribution are expected in U-MATIC tape. all partner1st September 1997
closed
A00012mosaic webactivate the web in Italian languageCINECASeptember 1997
closed
A00013MOSAIC LOGOprepare the MOSAIC suggested logos and select the final logo from a short list.all partner 27th July 1997
closed
A00014payment from UEdistribute percentage of founding to the partner BDR27th July 1997
closed
A00015WP 1100 upgrading of the documentpredispose the upgrading of the WP 1100 documentDISETmiddle of February
1998
 
A00016WP 1600 TN first issuemanage the WP activities JRCend of February 1998 
A00017WP 1700 document first issuemanage the WP activitiesINFOBYTE end of February 1998 


7. ANNEX B: DISSEMINATION PLAN

Date Event City
Partecipation
Presentation
Booth
Partner
10.01.97 nfo Day Educational Multimedia Brussels (B)
 
 
 
 
17 January 983 Incontro Tecnico Nazionale ARI Associazione Restauratori Italiani Assisi (I) 
 
 
 
02 97
Art Education Nouvelles Technologies
Paris (F)
 
 
 
 
10 February
Presentazione MOSAIC alla Città delle Science di Parigi
Paris (F)
 
    
11 February
La catalogazione delle collezioni d'arte delle banche (ABI)
Roma (I)
 
 
 
POLIMI
8-11 February
MILIA
Cannes (F)
x
x
 
INFOBYTE
25 Feb - 1 Mar
BIT - Borsa Internazionale del Turismo
Milan (I)
 
 
 
 
4-6 March
Imagina
Monaco
x
x
x
POLIMI
INFOBYTE
4-7 March
Euro-Med Net 98
Nicosia - Cyprus
 
 
 
POLIMI
10 March
ICOM-Workshop for "Digital Realization of Images in Museums"
Vienna - AU
 
 
 
 
19-25 March
CEBIT
Hannover (D) 
 
 
POLIMI
25-27 March
BITE - Bringing Information Technology to Education
Maastricht - NL
 
 
 
POLIMI
25-28 MarchCAA98 - Computer Applications In
Archaeology
Barcelona (E)
 
 
 
B ROMA
INFOBYTE
CINECA
23-28 MarchEVA '98 Florence Florence (I)   
ARENOTECH
27-28 March MediArTech - MoU Plenary Assembly Florence (I)
x
x
INFOBYTE
POLIMI
March/April
G7 General Meeting
Roma (I)
 
  
INFOBYTE
POLIMI
3-7 April
FutureShow
Bologna (I)
 
 
 
CINECA
6-10 April
EVA '98 Gifu
Gifu (J)
     
3-6 April
Archeoland 98 - Restauro 98
Ferrara (I)
 
 
 
CINECA
14-18 April
World Wide Conference
Brisbane - Australia
 
 
 
POLIMI
22-25 April
Museums and the Web 1998
Toronto (CA)
 
 
 
VELTMAN
27-29 April
Euro-Mediterranean Network Cooperation Cairo Workshop
Cairo - Egypt
 x
  
POLIMI
INFOBYTE
27-29 May
EVA '98 Athens
Athens
     
20 May
Multimedia Super Corridor
London, UK
 
 
 
 
4-6 June
EVA '98 Bucharest
Bucharest (R)     
 
Convegni SOMEDIA
 
 
 
 
 
 
SIME
Paris (F)
 
 
 
 
June
CERAM
Sophia Antipolis (F)
 
 
 
 
1-3 July
Virtual Words 98
Paris (F)
 
 
 
POLIMI
7-10 July
IEEE-ISIE '98
Portugal
 
 
 
POLIMI
19-24 July
Siggraph
Orlando, Florida - USA
 
  
INFOBYTE
POLIMI
23-24 July
EVA 98 Cambridge
Cambridge (UK)
 
 
 
 
September
CULT H
Wien (A)
 
 
 
POLIMI
1-5 September
Ichim
Paris (F)
 
 
 
 
Mid Autumn
Scandinavian Museum Fair
Goteborg
 
 
 
 
2-6 September
UAB Multimedia
Palma de Mallorca (ES)
 
 
 
 
8-12 September
Smart Communities
 
 
 
 
 
12-15 September
Cultural Heritage Network Hypermedia
Milan - (I)
 
  
POLIMI
24-25 September
EVA '98 Paris
Paris (F)
     
October
SMAU
Milan (I)
 
 
 
POLIMI
October
Frankfurt Buchmesse
Frankfurt (D)
 
 
 
 
2 December
EVA '98 Vienna
Wien (A)
     
6 December
SalonBit
Torino
 
 
 
 
7 December
EVA '98 Los Angeles
LA (CA)
     






8. ANNEX C: PLANNING - (next page)